The Rhum field as the largest remaining undeveloped gas reservoir in the UK Continental Shelf lies in Block 3/29a was discovered in 1977 by well 3/29a-2. An earlier well (3/29-1) which was drilled in 1973 was abounded to the high pressure gas. The Rhum field is located 380km North East of Aberdeen in a water depth of 109m and some 44km north of the BP-Operated Bruce field. Rhum received development approval from DTI on 21st May 2003. The Field production has started in Dec 2005 and contains reserve of about 0.8 trillion cubic feet (about 140 million barrels of boe) of gas condensate. The reservoir is high pressure, high temperature (HPHT) at pressures of 12,700 psia and temperatures of 150° Celsius and is owned 50% by BP and 50% by IOC UK Ltd.
|
Development of Rhum consists of 3 subsea wells tieback to the Bruce Compression Reception (CR) platform where the gas will be dried and co-mingled with Bruce field gas and compressed for export via the Frigg (UK) gas pipeline to St Fergus onshore terminal. All three wells are connected to a subsea central manifold, which are tied-back to the Bruce platform through a 44km insulated subsea pipe-in-pipe 22 inch high Integrity, Pressure Protection System (HIPPS) protected export pipeline. A new riser, ESDV, separator, slugcatcher and associated utility systems have been installed on the Bruce CR platform. Control of the facilities is via an umbilical run from the Bruce Platform to the field. |
|
Condensate from Bruce is exported through the existing pipeline to the Forties Unity Platform, for onward transport through the Forties Pipeline System (FPS) to Cruden Bay.
Rhum project is a unique set of challenge dealing with high reservoir pressures and temperatures, combined with the length of subsea tie-back which makes it as a world first project. |